simulation.modules.econ¶
- simulation.modules.econ.LCOE_from_capex_design_power(capex_design_dep, N_WEC, P_elec, FCR, efficiency)¶
costs taken from ‘CBS (Total)’ tab of the RM3 cost breakdown structure https://catalog.data.gov/ne/dataset/reference-model-3-cost-breakdown-rm3-wave-point-absorber
- simulation.modules.econ.econ(mass_material, M, cost_perkg_mult, N_WEC, P_elec, FCR, cost_perN_mult, cost_perW_mult, F_max, P_max, efficiency)¶